Tuesday, May 15, 2012

Kiln Roof Project

 Most of the building project break ground by digging holes.  Without the post hole digger, it is no way we can dig 8" diameter x 4' deep hole by hand. Lucky that Matt and Brian know what they're doing.

 However, even with the digger, we still couldn't get through some spots. Obstacles like tree root, stump, metal chain..... made the process very difficult and slow.

 With persistence and determination, we managed to avoid some tough spots.

 7 posts in ground with concrete at the end of the frist day.

 I forgot photo in day 2, and absented in day 3.  Here we see what happened today (day 4), after about 15 man day of work.

 Screwing down metal roof panel.

 Justin said he told his kiln "no more rain on", so we got to finish the roof today. Think about no more loading/ unloading under the sun, stoking under the rain.

Final roofing team. Just in time for the down pour. 